메뉴 바로가기 본문 바로가기

History

Lead’s path of leading the localization
of parts for semiconductor equipment development.

HISTORY OF LEAD
  • 2024 ~

    • Changed company name to Lead Co., Ltd.

  • 2023 ~ 2024

    • Developed Ultra High Temp Oxidation Furnace System, Hazardous Gas Treatment System (Scrubber)

  • 2022 ~ 2023

    • Developed Rapid Thermal Processing System Development (RTP)

  • 2021

    • 03.

      Expanded a business site with Plant 2 expansion

  • 2018 ~ 2020

    • Developed a 200mm Automation Vertical Furnace System

  • 2016 ~ 2017

    • Developed a 450mm Vertical Furnace System

  • 2015 ~ 2016

    • Developed a High-Temp Furnace System

  • 2013 ~ 2014

    • Developed a Horizontal Furnace System

  • 2010 ~ 2012

    • Expanded Plant 1, added Electronics Business

  • 2007 ~ 2010

    • Developed a Furnace System, established the R&D Center, acquired Venture and Innobiz

  • 2006

    • 06.

      Established Lead Engineering Co., Ltd.